My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2900 - Site Mitigation Program
>
PR0515580
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:38:21 PM
Creation date
9/14/2020 3:14:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515580
PE
2960
FACILITY_ID
FA0012230
FACILITY_NAME
MCDONALD ISLAND GAS STORAGE FAC
STREET_NUMBER
2121
STREET_NAME
ZUCKERMAN
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
2121 ZUCKERMAN
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.3 Well Completion and Development <br /> When all operations are completed in the boreholes, any open hole that would <br /> lie below the targeted well completion interval will be grouted with a volclay <br /> grout or neat cement up to the specified depth, prior to completing the well. <br /> The shallow monitoring well screen section will be completed in the <br /> uppermost ten feet of the saturated material. The shallow well will be <br /> completed as a ten foot screened interval monitoring well. <br /> The deep boring MW-11 (deep) will be sampled on five foot intervals in the <br /> first aquifer. It will be sampled continuously in the second aquifer, and will <br /> terminate two feet into the second aquitard. A steel conductor casing will be <br /> installed through the first aquifer two feet into the first aquitard (approximate <br /> depth of 45 ft. to 55 ft.). <br /> The shallow and deep monitoring wells will be completed with clean, two- <br /> inch Schedule 40 PVC blank casing and well screen. All casing and screen <br /> sections will be coupled with flush-threaded joints that are wrapped with <br /> Teflon tape, or fitted with Viton O-rings. No lubricants or glues will be used. <br /> Centralizers will be placed as needed. The screened section will be ten feet in <br /> length for all new monitoring wells. The bottom of the well screen will be <br /> capped with a slip-on-cap of the same material as the casing. Three or more <br /> self tapping stainless steel screws through the bottom cap will hold this <br /> bottom cap in place. A small diameter hole will be drilled through the bottom <br /> Z:%PROP-PRn1999U 574-p'&iA11Vpi-1574-I.dx <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.