4.1.3 Well Completion and Development <br /> When all operations are completed in the boreholes, any open hole that would <br /> lie below the targeted well completion interval will be grouted with a volclay <br /> grout or neat cement up to the specified depth, prior to completing the well. <br /> The shallow monitoring well screen section will be completed in the <br /> uppermost ten feet of the saturated material. The shallow well will be <br /> completed as a ten foot screened interval monitoring well. <br /> The deep boring MW-11 (deep) will be sampled on five foot intervals in the <br /> first aquifer. It will be sampled continuously in the second aquifer, and will <br /> terminate two feet into the second aquitard. A steel conductor casing will be <br /> installed through the first aquifer two feet into the first aquitard (approximate <br /> depth of 45 ft. to 55 ft.). <br /> The shallow and deep monitoring wells will be completed with clean, two- <br /> inch Schedule 40 PVC blank casing and well screen. All casing and screen <br /> sections will be coupled with flush-threaded joints that are wrapped with <br /> Teflon tape, or fitted with Viton O-rings. No lubricants or glues will be used. <br /> Centralizers will be placed as needed. The screened section will be ten feet in <br /> length for all new monitoring wells. The bottom of the well screen will be <br /> capped with a slip-on-cap of the same material as the casing. Three or more <br /> self tapping stainless steel screws through the bottom cap will hold this <br /> bottom cap in place. A small diameter hole will be drilled through the bottom <br /> Z:%PROP-PRn1999U 574-p'&iA11Vpi-1574-I.dx <br /> 10 <br />