My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10715
>
2300 - Underground Storage Tank Program
>
PR0541281
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 10:53:44 AM
Creation date
9/14/2020 3:26:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541281
PE
2361 - UST FACILITY
FACILITY_ID
FA0023650
FACILITY_NAME
Trinity Parkway AMPM ARCO #83819
STREET_NUMBER
10715
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
Stockton
Zip
95219
APN
6602002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
10715 Trinity PKWY Stockton 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM <br /> Type of Action : ❑ Installation Inspection ❑ Repair Inspection ® 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment <br /> Inspection 4/26/2019 <br /> Business Name Arco AMPM Trinity Pkwy <br /> Business Site Address 10715 Trinity city Stockton zip code <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of Service Technician (on ICC Certification ) Darnell Smith Phone # 916-371-2380 <br /> Contractor License #: 433159 ICC Certification : 8709494 ICC Expiration Date : 12/21/2019 <br /> Overfill Prevention Equipment Relevant Certifications ( List Applicable) : <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑ Manufacturer Guidelines (Specify) : <br /> Used : <br /> ® Industry Code or Engineering Standard (Specify) : PEI 1200 Pg. 18 <br /> ❑ Engineered Method (Specify) : <br /> Attach the inspection procedures and all documentation required to determine the results. # of attached pages : <br /> Tank ID : ( By tank number, stored 87 87 91 DSL <br /> What is the tank inside diameter? ( inches ) 119 119 119 119 <br /> Is the Fill Piping Secondarily contained ? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No <br /> Is the Vent Piping Secondarily contained ? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No <br /> Overfill Prevention Equipment OPW OPW OPW OPW <br /> Manufacturer <br /> Tank Manufacturer Xerxes Xerxes Xerxes Xerxes <br /> What is the overfill prevention equipment ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> response when activated ? ® Restricts Flow ® Restricts Flow ® Restricts Flow ® Restricts Flow <br /> ( Check all that apply) ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent E] Yes ® No ❑ Yes ® No El Yes ® No El Yes ® No <br /> piping? <br /> At what level in the tank is the overfill <br /> prevention set to activate? ( Inches from 1041/211 105 " 109 " 1091/211 <br /> bottom of tank , ) <br /> What is the percent capacity of the tank at <br /> which the overfill prevention equipment 94% 94% 97% 97% <br /> activates ? <br /> Is the overfill prevention in proper ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> operating condition to respond when the ❑ No (Specify in V. ) ❑ No (Specify in V. ) ❑ No (Specify in V. ) ❑ No (Specify in V. ) <br /> substance reaches the appropriate level ? <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ® Fail ❑ Pass ® Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> REO <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California 126W of kegul'ati6fis, Title 23, <br /> Division 3, Chapter 16, Section 2637 . 2 and all the information contained herein is accurate <br /> UST Service Technician Signature ENVIRONMENTAL HEALTH <br /> )� -0� DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.