My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10715
>
2300 - Underground Storage Tank Program
>
PR0541281
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 10:53:44 AM
Creation date
9/14/2020 3:26:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541281
PE
2361 - UST FACILITY
FACILITY_ID
FA0023650
FACILITY_NAME
Trinity Parkway AMPM ARCO #83819
STREET_NUMBER
10715
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
Stockton
Zip
95219
APN
6602002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
10715 Trinity PKWY Stockton 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES :Q NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove and replace the 91 and dsl drop tubes ; like for like- with OPW 71 so non testable . Due to overfill valve <br /> being set too high . Test with county upon completion of repair. <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> ( 2 ) OPW 71 so non testable drop tubes <br /> EH230038 (revised 12-11A5) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.