My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2800 - Aboveground Petroleum Storage Program
>
PR0541937
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:07 PM
Creation date
9/14/2020 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6 : APPLY GREASE TO DROP TUBE <br /> Apply black moly grease to the inside diameter of the <br /> upper drop tube . Make sure coverage is completely <br /> around the tube as shown in Figure 6 . <br /> c <br /> Figure 8 <br /> NOTE : Testable inlet tube must have cable port in <br /> line with float . Testable inlet tube bottoms out on <br /> stop, it does not bottom out on inlet flange . See Fig- <br /> ure 8A <br /> Figure 6 <br /> STEP 7 : APPLY GREASE TO POLYPAK SEAL <br /> Ensure that the polypak seal is installed on the inlet <br /> tube with the lip up as shown in Figure 7. Apply black <br /> moly grease to the polypak as shown . Make sure cover- <br /> age is completely around the polypak seal . <br /> Ensure polypak <br /> lip is up Cable port must be in <br /> line with float <br /> Inlet ( a <br /> Tube / , Polypak <br /> Figure 8A <br /> Testable Models Only <br /> Apply grease <br /> around polypak SEE PAGE 8 FOR INSTRUCTIONS USING THE 71 SO- <br /> TOOL. <br /> Figure 7 <br /> SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br /> STEP 8 : INSTALL INLETTUBE TOOLC . <br /> Insert the inlet tube into the upper tube until the upper <br /> tube seats against the flange on the inlet tube . Ensure SEE PAGE 10 FOR INSTRUCTIONS USING THE 71 SO " <br /> polypak is inserted evenly and stays in inlet tube TOOLCT. <br /> groove . Note: testable 71SO models ending with a 'T" require the <br /> 71 SO- TOOLCT or modified 71 SO- TOOL or 71 SO- TOOLC <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.