My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2800 - Aboveground Petroleum Storage Program
>
PR0541937
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:07 PM
Creation date
9/14/2020 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13 : DIMPLE FIRST HOLE STEP 15 : DIMPLE REMAINING HOLES <br /> Remove tool . Remove any chips or burrs from the drill- Remove any chips or burrs from the drilling operation . <br /> ing operation . Place the assembly on a solid surface . Dimple the next (2) holes as done in Step 13 . Make sure <br /> Using the punch supplied with the 71 SO-TOOL, 71 SO- the assembly is on a solid surface when punching . After <br /> TOOLC, and 71 SO-TOOLCT, align the tip of the punch punching , remove any chips that may have fallen into <br /> with the drilled hole and dimple the upper drop tube by the inlet tube screw hole . <br /> striking the punch with a hammer until the drop tube is <br /> formed into countersunk hole in the inlet tube . After <br /> punching , remove any chips that may have fallen into <br /> the inlet tube screw hole . <br /> Align punch with ( > <br /> drilled hole <br /> Figure 15 <br /> STEP 16 : ASSEMBLE OTHER SCREWS <br /> Apply black moly grease to screws and tighten the oth - <br /> er (2) screws into inlet tube with a screwdriver as done <br /> Figure 13 in Step 14 . Use only the taptite screws that are supplied <br /> with the unit . Seating torque is 20 in - lbs min . to 35 in - <br /> STEP 14: ASSEMBLE FIRST SCREW lbs max. Do not over tighten . <br /> Ensure that the drop tube was formed into the counter- <br /> sunk screw hole as shown in Figure 14 if not return to STEP 17 : APPLY GREASE TO LOWER O- RING AND <br /> Step 13 . Apply black moly grease to screw and tighten BODY THREADS <br /> first screw into inlet tube with a screwdriver . Use only Apply black moly grease to the lower tube o- ring and <br /> the taptite screws that are supplied with the unit . Seat- body threads as shown . Make sure coverage is com - <br /> ing torque is 20 indbs min . to 35 in - lbs max. Screw head pletely around the o- ring . Install o-ring in groove just <br /> should be flush with the drop tube . Do not over tight- above threads . <br /> en . <br /> Apply grease <br /> around o- ring <br /> Ensure the drop tube Is formed Into <br /> countersunk hole <br /> O -ring <br /> Figure 14 groove Body threads <br /> Figure 17 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.