My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2800 - Aboveground Petroleum Storage Program
>
PR0541937
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:07 PM
Creation date
9/14/2020 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery <br /> Fill Riser <br /> is r <br /> 6T r <br /> r <br /> X <br /> OPW <br /> Ball Float <br /> 14" Minimum — <br /> Clearance for <br /> Tube Cut Float 4 " NPT <br /> per Loca I Nipple <br /> Requirements <br /> a <br /> 6" <br /> �— Align Float Along Length of Tank Swivel <br /> Figure 24 <br /> Product Jack <br /> Adaptor Screw <br /> Kit <br /> Orient socket <br /> adaptor be- FOR TESTABLE MODELS ONLY: Check installation <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly. See page 17 for full testing details . Ap- <br /> ply pipe dope to the socket adaptor threads . Pipe dope <br /> should be a non - hardening gasoline resistant pipe <br /> thread seal compound . Install socket adaptor and <br /> O torque to 3 . 5 ftdbs (42 indbs) minimum to 5 . 0 ft- lbs (60 <br /> indbs) maximum . After installing socket adaptor where <br /> required , pressure test testable overfill valve per CARB <br /> TP201 A D to ensure valve is vapor tight . <br /> Figure 24A <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.