My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2800 - Aboveground Petroleum Storage Program
>
PR0541937
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:07 PM
Creation date
9/14/2020 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST INSTRUCTIONS Socket <br /> POPPET & FLOAT MOVEMENT adaptor <br /> FOR TESTABLE MODELS ONLY <br /> TOOLS NEEDED FOR TESTING : <br /> 1 . 1 /4" square drive extension or 3 /8" square drive ex- <br /> tension with 3 /8" to 1 /4" socket adapter . <br /> 2 . Torque wrench / 1 /4" or 3 /8" square drive ratchet <br /> wrench . <br /> 3 . Pipe dope . <br /> 4 . Flashlight (optional ) . <br /> Open Poppet Closed Poppet <br /> TEST STEP 1 : <br /> Remove spill container cover and fill cap from fill adapt- Test Figure 1 <br /> er and look down into the tube and make sure no debris Pull on extension and <br /> or foreign objects are present . If debris or foreign ob - socket adaptor <br /> jects are present take appropriate steps before proceed - <br /> ing . Look down into the tube and ensure poppet is <br /> completely protected by the deflection shield . See Test <br /> Figure 1 . If poppet is exposed and tank is not full the <br /> overfill valve should be replaced . A flashlight may help __ } <br /> when inspecting the tube . <br /> TEST STEP 2 : <br /> Unthread the socket adaptor assembly from the inlet <br /> tube using a 1 /4" square drive extension and wrench . l <br /> The extension will attach to the socket adaptor . Secure <br /> all tools to ensure they don 't fall into the tank or valve . _ <br /> With the extension still attached pull on the socket _-- — — - - -_ — ._ — <br /> adaptor and cable assembly and ensure float and pop- — — — <br /> It should only require 3 "pet move / properly . <br /> ` <br /> to 4" of movement and less than 5 lbs of force in order <br /> k .r <br /> to actuate the float and poppet. When looking down <br /> into the upper tube ensure poppet is visible and moves <br /> into the flow path (see Test Figure 1 & 2) when socket Open <br /> adaptor is pulled and resets properly when socket adap- Poppet Closed <br /> for is released . If poppet does not actuate freely take \ Poppet Float moves <br /> appropriate steps to correct . N up <br /> TEST STEP 3 : <br /> Apply pipe dope to the socket adaptor threads . Pipe <br /> dope should be a non - hardening gasoline resistant pipe <br /> thread seal compound . Make sure poppet and float <br /> have reset properly and are not visible then install sock- <br /> et adaptor and torque to 3 .5 ft- lbs (42 in - lbs) minimum <br /> to 5 .0 ft- lbs (60 indbs) maximum . After installing socket <br /> adaptor, to ensure vapor tightness, OPW recommends <br /> conducting pressure testing per CARB TP201 . 1 D . Some Test Figure 2 <br /> areas may require pressure testing of overfill valve per <br /> CARB TP201 . 1 D to ensure valve is vapor tight . If the <br /> drop tube fails pressure testing it may be necessary to <br /> check the seal at the poppet adaptor threads . Reinstall <br /> fill cap and spill container cover after testing . <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.