My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2800 - Aboveground Petroleum Storage Program
>
PR0541937
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:07 PM
Creation date
9/14/2020 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br /> Important : This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions . All length measurements are in inches . Please contact the Authority Having Jurisdic- <br /> tion (AHJ ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region , as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in - �^ <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures ) , upper tube length . <br /> Note: the Upper Tube Length must be at least 16" to in- <br /> clude the protective bend in the tube . <br /> ( D) _ <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . (D) <br /> (W) = Upper <br /> ( U ) = Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank . Note : If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0 . 6 ") (W) Valve <br /> ( B) = Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume . (B) <br /> (Y) = To Tank <br /> (Y) <br /> 1 . To determine shut-off percentage: Tank <br /> Subtract upper tube length ( D) from distance to tank (U ) Valve Chart <br /> bottom ( B) Length, 100% <br /> (X) _ ( B ) — ( D) - 2 " = top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = <br /> (Y) tank capacity in gallons = ---------- - --- - --- - -- --- <br /> SO% _ (X ) capacity / (Y) capacity x100 = <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local , state, and national codes . If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced . For <br /> reference 40 CFR part 280 Subpart B Section 280 . 20 overfill <br /> valves should be set to a maximum of 950/6. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.