My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:34 AM
Creation date
9/15/2020 8:05:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? © ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : © 3 GPH ❑ 0 . 1 GPH ❑ 0. 2 GPH <br /> Was the testing apparatus properly calibrated ? Q ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ W1 <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ Q <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑✓ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? © ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? 0 El <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? Q El El <br /> all items on the equipment manufacturer's maintenance checklist completed ? © ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? W1 El 1:1 <br /> For any answer of "N" above, describe in Section XIII how and when these issues w r oP will be~ corrected , i -. <br /> XIII . COMMENTS `" ' <br /> 40 F W4P 41 <br /> lr. 1d ' a ... 'i t : 3 <br /> XIV. VACUUM / PRESSURE I HYDROSTATIC MONITORIN6E�QUIPE$T11 �� <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) © Vacuum ❑ Pressure © Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S-2 REG VAC PRODUCT © Pass ❑ Fail [21 Pass ❑ Fail <br /> S-3 REG STP VAC VAPOR ❑✓ Pass ❑ Fail ❑✓ Pass ❑ Fail <br /> S-4 REG STP VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> S-7 PREM VAC PRODUCT © Pass ❑ Fail © Pass ❑ Fail <br /> S-8 PREM VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> S- 11 DIESEL VAC PRODUCT W✓ Pass ❑ Fail ❑✓ Pass ❑ Fail <br /> S- 12 DIESEL VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? © Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? © Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> Brine Communication not required to be tested per Inspector, <br /> i <br /> t <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identfication <br />
The URL can be used to link to this page
Your browser does not support the video tag.