Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? © ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : © 3 GPH ❑ 0 . 1 GPH ❑ 0. 2 GPH <br /> Was the testing apparatus properly calibrated ? Q ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ W1 <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ Q <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑✓ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? © ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? 0 El <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? Q El El <br /> all items on the equipment manufacturer's maintenance checklist completed ? © ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? W1 El 1:1 <br /> For any answer of "N" above, describe in Section XIII how and when these issues w r oP will be~ corrected , i -. <br /> XIII . COMMENTS `" ' <br /> 40 F W4P 41 <br /> lr. 1d ' a ... 'i t : 3 <br /> XIV. VACUUM / PRESSURE I HYDROSTATIC MONITORIN6E�QUIPE$T11 �� <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) © Vacuum ❑ Pressure © Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S-2 REG VAC PRODUCT © Pass ❑ Fail [21 Pass ❑ Fail <br /> S-3 REG STP VAC VAPOR ❑✓ Pass ❑ Fail ❑✓ Pass ❑ Fail <br /> S-4 REG STP VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> S-7 PREM VAC PRODUCT © Pass ❑ Fail © Pass ❑ Fail <br /> S-8 PREM VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> S- 11 DIESEL VAC PRODUCT W✓ Pass ❑ Fail ❑✓ Pass ❑ Fail <br /> S- 12 DIESEL VAC VENT © Pass ❑ Fail © Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? © Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? © Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> Brine Communication not required to be tested per Inspector, <br /> i <br /> t <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identfication <br />