Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII , LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ( LLD) are NOT installed . (Do not complete this section.) Y N N/A <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance ? ® ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the test apparatus properly calibrated ? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected ? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or ® ❑ ❑ <br /> disconnected ? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a ® ❑ ❑ <br /> test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks ? ® ❑ I ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements ? ® ❑ I ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> I <br /> XIV , VACUUM/ PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH Monitoring is NOT used . (Do not complete this section. ) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type ( Mark all that apply. ) ® Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component)s) Monitored By This Sensor Sensor Functionality Interstitial <br /> Test Communication Test <br /> 317 87 Prod ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 518 87=91 vapor ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 519 87 vent ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 520 91 prod ® Pass ❑ Fail ❑ Pass E] Fail <br /> 521 91 vent ® Pass ❑ Fail 1 ❑ Pass ❑ Fail <br /> 522 DSL prod ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 523 DSL vent ® Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual inspection <br /> ❑ Other (Describe the method in Section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in interstitial spaces ? ❑ Yes ❑ No ( Describe the reason in section XV below. ) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br />