My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2758
>
2300 - Underground Storage Tank Program
>
PR0541416
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 11:19:01 AM
Creation date
9/15/2020 9:41:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541416
PE
2351
FACILITY_ID
FA0023733
FACILITY_NAME
Sunwest Chevron
STREET_NUMBER
2758
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95242
APN
16646031
CURRENT_STATUS
01
SITE_LOCATION
2758 W Kettleman Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII , LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ( LLD) are NOT installed . (Do not complete this section.) Y N N/A <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance ? ® ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the test apparatus properly calibrated ? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected ? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or ® ❑ ❑ <br /> disconnected ? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a ® ❑ ❑ <br /> test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks ? ® ❑ I ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements ? ® ❑ I ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> I <br /> XIV , VACUUM/ PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH Monitoring is NOT used . (Do not complete this section. ) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type ( Mark all that apply. ) ® Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component)s) Monitored By This Sensor Sensor Functionality Interstitial <br /> Test Communication Test <br /> 317 87 Prod ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 518 87=91 vapor ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 519 87 vent ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 520 91 prod ® Pass ❑ Fail ❑ Pass E] Fail <br /> 521 91 vent ® Pass ❑ Fail 1 ❑ Pass ❑ Fail <br /> 522 DSL prod ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 523 DSL vent ® Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual inspection <br /> ❑ Other (Describe the method in Section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in interstitial spaces ? ❑ Yes ❑ No ( Describe the reason in section XV below. ) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.