Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Pressure Gauges in Psi/Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> WIN <br /> Piping Run # I Piping Run # 2 Piping Run # 3 Piping Run # <br /> Piping Material : Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer : Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3 " <br /> Length of Piping Run: 100 ' 110 ' 75 ' <br /> Product Stored : Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation : Piping Sump # 1 Piping Sump #2 Piping Sump #3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time : 8 : 55 9 : 05 9 : 15 <br /> Initial Reading (RI) : 5 Psi 5 Psi 5 Psi <br /> Test End Time : 9 : 55 10 : 05 10 : 15 <br /> Final Reading (RF) : 5 Psi 5 Psi 5 Psi <br /> Test Duration : 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />