My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:43:53 PM
Creation date
9/15/2020 11:37:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y = Yes, N = No, NA Not <br />UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br />VIII. MONITORING SYSTEM AND PROGRAMMING <br />This section must be completed if a monitoring panel is used to perform leak detection monitoring. <br />;Y <br />N <br />NA <br />Are the visual and audible alarms operational? <br />r <br />r <br />r <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats <br />move freely, functionally tested, and confirmed operational? <br />r <br />�- <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br />interfere with their proper operation? <br />ry <br />r <br />r <br />Was monitoring system set-up reviewed to ensure proper settings? <br />r <br />r <br />Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? <br />r <br />r <br />r <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under -dispenser containment? <br />r <br />r <br />r <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is <br />electrically disconnected? <br />r <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />Which sensors initiate positive shut down? (Check all that apply.) Iv, Sump P7 Under -dispenser containment <br />W <br />r <br />r <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />IV <br />r <br />r <br />For any answer of "N" above, describe in section IX how and when these deficiencies were or will be corrected. <br />IXw COMMENTS <br />Use this section to provide any additional comments about the inventory of the equipment certified. <br />X IN -TANK GAUGING TESTING <br />W Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br />r Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br />This section must be completed if in -tank gauging is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including <br />testing for ground faults? <br />r <br />r <br />r <br />Were all in -tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, <br />functionally tested, and confirmed operational? <br />r <br />r <br />r <br />Was accuracy of system's product level readings tested? <br />r <br />r <br />r <br />Was accuracy of system's water level readings tested? <br />r <br />r <br />r <br />Were all probes reinstalled properly? <br />r <br />r <br />r <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />r <br />r <br />r <br />For any answer of "N" above, describe in section XI how and when these deficiencies were or will be corrected. <br />XI. COMMENTS <br />Use this section to provide any additional comments about the inventory of the equipment certified. <br />Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.