My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:43:53 PM
Creation date
9/15/2020 11:37:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 1/21/2019 <br />If you already have a site plan that shows all <br />required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show <br />the general layout of tanks and piping and clearly identify locations of the following <br />equipment, if installed: 1) monitoring system <br />control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices <br />monitoring tank annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent <br />piping; 7) devices monitoring vapor recovery <br />piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under -dispenser <br />containment; 10 line leak detectors; and 11 <br />devices monitoring any other secondary containment areas. <br />L5 <br />17 VM I <br />Ocas <br />L2 L1 <br />O <br />L9 <br />F F <br />LG <br />ESO <br />V V <br />A A <br />L8 L10 sTP <br />ESO <br />SUP STP <br />L4 <br />ESO <br />UL <br />B <br />Chevron #99840 <br />4344 Waterloo Rd. <br />N <br />Stockton, CA <br />CAR WASH <br />wtE <br />INCON/ VR BRKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.