Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> -- - -- ---- - - - - - - - - -- - - - - - - - - - -- -- - - - - -- - - - --- - -- -- - - - -- -- - -- - - — - - - - - - - - - - - - - - -- -- - -- - - - --- - - - - --- - -- - - - - - - <br /> Site Address: Country Mart 34243 S Chrisman Rd Tracy CA 95376 � <br /> Store x . . . . . . x <br /> TL TL TL <br /> x x x <br /> DIE . . . . . . . . . . . . . . . . . . . . . . . *PIPItc <br /> (ARROWS) <br /> DIE Drawing of piping <br /> F 87 exit of sump and <br /> UDC's. \o <br /> rmdereround <br /> L . . . . . . . dratvinS is <br /> TP . . . . . . . . - - accurate. the <br /> P cannot speculate <br /> blue print;. <br /> F i' V Lr <br /> 91 g <br /> A PA <br /> KEY <br /> A A = &NN-ULAH <br /> F = FILLS <br /> T = TURBINE <br /> . P = PROBE <br /> . . . . . 9%'_ \: POR <br /> X = SUMP SENSOR <br /> L = LD <br /> M = Afanmay <br /> B = Brine Sensor <br /> Alit, irennrrrrLrgrvrorincedare not risibleYo, the re) rVlinguclaticfarrcooa I = Smart Sensor <br /> p-.2P•ssfornlopirSenorat• nrrlo-esde�i•J'w- ir onrnrarrrlprnpxEW. Dr-rnring S = STP <br /> 1101 fo sera e C = Floats & Chains <br /> E — E Stop <br /> Date map was dratyn: 412/ 19 <br /> 111luumfiam <br /> If you already have a diagram that shows all required Information, you way include it, rather than this page, with your Monitoring System Certification. On yoursite plan, <br /> show the general layout of tanks and piping. Clearly identify locat-ons of the following equipment, if installed: monitoring system contmi panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers , or other serandary containment areas mechanical or etertronn line leak defectors; and in-tank liquid level <br /> probes (if used for teak detectan). In the space provided, note the data this Site Plan was prepared. <br /> LEGEND <br />