Laserfiche WebLink
(auiN 2 SAN J O A Q U I N Environmental Health Department <br /> COUNTY Kasey Foley , REHS , Director <br /> cgC7FOR� Greatness grows here . PROGRAM COORDINATORS <br /> -- Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> November 19 , 2019 <br /> BZ SERVICE STATION MAINTENANCE/MVP <br /> PO BOX 933/ PO BOX 281 <br /> WEST SACRAMENTO , CA 95691 <br /> Amended SR0081125 <br /> Re : ARCO CHEROKEE GAS & MART* <br /> 900 S CHEROKEE LN <br /> LODI , CA 95240 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to install ( 1 ) new diesel dispenser and Bravo conversion frame on <br /> UDC 11 / 12 and to replace the spill container and overfill prevention equipment on the diesel <br /> underground storage tank ( UST) system at the above noted address . The permit has been <br /> approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District <br /> for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ustCc sigov . orq or contact Shewit Woldearegay at (209) 468- <br /> 0216 to arrange the following appointments ( a 48- hour notice is required for inspection <br /> appointments ) . <br /> a ) Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> b ) Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent) . Proper drainage must also be verified . <br /> c) Overfill prevention verification : Measurement of drop tubes to verify 95 % tank <br /> volume shut off. Verification of flapper functionality . Ensure that all pertinent tank <br /> charts and calculations are available for review at the time of inspection . <br /> d ) Since concrete will be broken near the diesel tank , a secondary containment test <br /> must be performed on the diesel tank once concrete is poured in accordance with <br /> the manufacturer' s guidelines . <br /> e) Verification of the dispenser footprints contained by the under dispenser <br /> containment sumps ( UDCs ) . <br /> f) Visual inspection of the piping within the dispensers . <br /> Please be aware that the facility cannot receive fuel in the diesel tank prior to the <br /> EHD inspection and approval . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjgov . org/ehd <br />