My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 12:56:14 PM
Creation date
9/15/2020 12:36:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AT&T <br /> AT&T Services, Inc . <br /> Environment, Health & Safety <br /> 5001 Executive Parkway, Room 4W200 <br /> San Ramon, CA 94583 <br /> August 6 , 2019 <br /> Original via e-mail on 8/6/ 19 <br /> stwoldearegaygsi gov . org <br /> Ms . Shewit Woldearegay <br /> San Joaquin County Environmental Health Dept . <br /> 1868 E . Hazelton Ave . <br /> Stockton, CA 95205 <br /> RE : Required Follow-Up Action, Your Inspection of 7/9/ 19 for AT&T California <br /> Facility at 345 N. San Joaquin St, Stockton , CA 95202 (UE042) , ITS # 184038 <br /> Dear Ms . Woldearegay : <br /> We are pleased to report status of the corrective actions that you required pursuant to your <br /> Notice of Violation referenced above : <br /> ➢ Failure to conduct the designated UST operator visual inspection at least <br /> once every 30 days . <br /> 1 ) A designated operator inspection was performed on Nov. 20 , 2918 and the <br /> next inspection was performed on Dec. 21 , 2019 , 31 days later. The <br /> designated operator visual inspections shall be conducted within 30 days <br /> or less of the previous inspection . Ensure all designated inspections are <br /> performed within the required time frames . <br /> 2) The following was observed on the designated operator ' s monthly <br /> inspection reports . <br /> The " N/NA" in sections VI through XI were not fully explained on the <br /> October-February monthly inspection reports . <br /> The 10/25/18 monthly inspection report was observed to be signed on <br /> 2/19/19 . <br /> - Overfill prevention testing was incorrectly marked "N" on the <br /> October-December monthly inspection reports . <br /> Line tightness testing was marked "YES " however, date of <br /> performance was left blank on the October-February monthly <br /> inspection reports . <br /> Tank tightness testing was marked " NA" however, date of <br /> performance was noted to be 7/11 /18 on the October-February <br /> monthly inspection reports . <br /> During the visual inspection , the designated operator shall check all <br /> required testing and maintenance for the UST system have been <br />
The URL can be used to link to this page
Your browser does not support the video tag.