Laserfiche WebLink
6� ' Oo 0 <br /> Turbine O TurbineO rbineO r _ <br /> Sump Sump Sump FLAT METAL <br /> O I I / N <br /> REQUIRED <br /> O QO TO SUSPEND <br /> O PROBE o 0 <br /> (SIDE VIEW) rT1 F41 0 0 <br /> I <br /> I <br /> SUMP FOR <br /> ' O o / FOR FOUR <br /> ao <br /> / SCREW- IN , PROBE <br /> 3 o CABLE PLUGS <br /> O I O i� EO 20 <br /> o . 0 0 <br /> Tank Pad o 71.1;I <br /> �r <br /> TAPE / WEIGHT DOWN �L= <br /> CABLE TO PREVENT <br /> Op 10 Feet - Min , Distance ACCIDENTAL <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS - STS <br /> ( PROBE CABLE SUMP TEST SYSTEM <br /> PN : 600 - 0200 SPLIT RING o 0 0 <br /> = 50 FEET ) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3 - PRONGED <br /> CONES PLUG <br /> suxr <br /> ° RB- 12 <br /> TESTING <br /> GROUNDED yy F.7LEAK <br /> E WITH : <br /> 3 PRONG SP <br /> EXTENSION ® LESS <br /> STEEL FLOAT <br /> CORD REQ ' D <br /> TS-STS <br /> SUMP TEST SYSTEM <br /> DUU <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> ( Side View ) <br /> BUILDING <br /> Figure 1. 3 Typical Leak Detection Probe — Turbine Sump Installation Figure 1. 4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br />