Laserfiche WebLink
U E046 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ❑x 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10207021 7/ 16/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Pacific Bell Telephone Co . dba AT&T California <br /> Business Site Address City ZIP Code <br /> 907 Lincoln Rd . Stockton 95207 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Jarrett Flewellyn (714) 560-8222 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 588098 8028164 2/20/2021 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> EMCO Wheaton <br /> EMCO Wheaton - 3048 . 11 /16/2019 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : <br /> Used : EMCO Wheaton Installation Manual <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages <br /> TANK ID : (By tank number, stored product, etc.) UE0460002 <br /> What is the tank inside diameter? (Inches) 64 . 00 <br /> Is the fill piping secondarily contained? 0 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ❑ Yes Z No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) EMCO Wheaton <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> ❑ <br /> (Check all that apply) Restricts Flow El Restricts Flow ❑ Restricts Flow El Restricts Flow <br /> ❑ AN Alarm ❑ AN Alarm ❑ AN Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? x❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 54 . 75' <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 91 % <br /> Is the overfill prevention in proper operating condition ❑x Yes ❑ Yes El Yes El Yes <br /> to respond when the substance reaches the <br /> appropriate level? E] No (Specify in V) El No (Specify in V) ❑ No (Specify in V.) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑x Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> ❑ Check If Action Item (s) Are Present <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3 , Chapter 16, Section 2637 . 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AN = Audible and Visual <br />