Laserfiche WebLink
Pg 3 <br /> o o <br /> r <br /> Turbine O TurbineO Turbine 0 <br /> I Sump Sump Sump FLAT METAL <br /> O /ANGLEIRON <br /> REQUIRED <br /> TOi r�O TO SUSPEND <br /> r PROBE o 0 <br /> I I (SIDE VIEW) <br /> r RECEPTACLES <br /> r ' / <br /> SUMP 4FOR FOUR <br /> 0 <br /> I O SCREW IN, PROBE <br /> 30 CABLE PLUGS <br /> O O 100010 20 <br /> 01O <br /> Tank Pad <br /> � -- -- - - - - -- _fid <br /> TAPE/WEIGHT DOWN <br /> CABLE TO PREVENT <br /> O 10 Feet-Min. Distance ACCIDENTAL O <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> (PROBE CABLE SUMP TEST SYSTEM <br /> PN:600-0200 SPLIT RINGo 0 0 <br /> =50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3-PRONGED <br /> CONES ` PLUG <br /> SUYI O <br /> STS-PRB-12 <br /> LEAK TESTING <br /> PROBE WITH: <br /> GROUNDED yy s TSP-SSP <br /> 3 PRONG <br /> STAINLESS <br /> EXTENSION ® STEEL FLOAT <br /> CORD REO'D <br /> TS-STS <br /> SUMP TEST SYSTEM <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure I.3 Typical Leak Detection Probe— Turbine Sump Installation Figure 1.4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br /> — .0- — <br />