Laserfiche WebLink
0 0 <br /> o �— o <br /> Turbine O TurbineO Turbine o i <br /> T <br /> I Sul p Sump Sump FLAT METAL <br /> O /ANGLE IRON <br /> O REQUIRED <br /> TO SUSPEND <br /> PROBE o 0 <br /> I I (SIDE VIEW) 0 0 <br /> i RECEPTACLES <br /> O SUMP o FOR FOUR <br /> / SCREW-IN,PROBE <br /> 30 CABLE PLUGS <br /> O � p10 <br /> 000 zo <br /> Tank Pad I <br /> TAPE/WEIGHT DOWN <br /> CABLE TO PREVENT <br /> 10 Feet-Min. Distance ACCIDENTAL <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS rMF <br /> (PROBE CABLE 'IN SUMP TEST SYSTEM <br /> PN:600.0200 SPLIT RING o 0 0 <br /> =50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3-PRONGED <br /> CONES `-7 _j PLUG <br /> SUYP <br /> ° STS-PRB-12 <br /> LEAK TESTING <br /> GROUNDED pie PROBE WITH: <br /> TSP-SSP <br /> 3 PRONG STAINLESS <br /> EXTENSION ® <br /> STEEL FLOAT <br /> CORD REQ'D <br /> TS-STS <br /> SUMP TEST SYSTEM <br /> D <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure 1.3 Typical Leak Detection Probe— Turbine Sump Installation Figure 1.4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br /> — <br />