My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
9/15/2020 2:19:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer I Identify Tank ID from Section III for each Manufacturer <br /> Modern Weldinq I A S1 I B x❑ C z D ❑ <br /> A ❑ I B ❑ C ❑ I D <br /> Test Method Used: ❑Manufacturer GuidelinesS eci <br /> ( p fY) <br /> Z Industry Code or Engineering Standard (Specify): PEI/RP1200-17/Glass/Steel Tank/-10" Hg. 2 Hours <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802-UT 4/3/2019 <br /> Underground Storage Tank Tester License #90-1120 12/31/2019 <br /> VI. COMMENTS <br /> Provide any additional comments here. <br /> Tank#1-A-#2-B--C, is a 20K Triple Compartment, 1 OK Regular 87, 5K Super 91 and 5K Diesel. Single Tank <br /> Secondary Containment. <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Ameron FRP A ❑x B ❑x IC ❑x D ❑ <br /> A ❑ B ❑ I C ❑ D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard (Specify): PEI/RP1200-17/Fiberg lass Pipe/5 Psi 1 hour <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802-UT 4/3/2019 <br /> Under round Storage Tank Test License #90-1120 12/31/2019 <br /> Interstitial Communication Verification Method Used: <br /> Release pressure at end of Piping Run at UDC's when applicable. <br /> VIII. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.