My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 9:47:36 AM
Creation date
9/15/2020 3:34:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> the spill bucket, The vacuum level is monitored for <br /> NOTE : If the fill cap is not included in the <br /> spill bucket test and/or the cap is not tight, it a 1 -minute period . <br /> could be the source of potential fuel contami- 6 .3 :3 Test Equipment. Test equipment shall <br /> nation from water intrusion. include: <br /> • vacuum test apparatus (The test apparatus may <br /> NOTE: Before permanently plugging, ensure be available from the spill bucket manufacturer. <br /> that local regulations allow the drain valve to It includes an air pressure regulator, a vacuum <br /> be permanently plugged . source, a vacuum gauge with a minimum 0-50 <br /> inch water column range and a control valve. <br /> 6. 2.5 Test Procedure. The control valve is used to adjust the vacuum <br /> 1. Add water to the spill bucket to a level within level.) ; <br /> 1 .5 inches of the top of the spill bucket. Allow test cover (The cover is equipped with a test fit- <br /> the water to settle for S minutes before the initial ting.) ; <br /> water level measurement is taken. <br /> • plumber ' s plug (appropriate size, if used) ; <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1 -second increment; <br /> ment to be taken. The location of the measuring gasketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight seal <br /> measurement. Document the initial water level between the test cover and the spill bucket .) . <br /> measurement as measured from the bottom of <br /> the spill bucket. Alternative measurement meth- o - 5fl water column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1/16 (0.063) inch can be made. source i <br /> 3 . Take all precautions to prevent the water level <br /> from being disturbed during the duration of the control <br /> test. Valve <br /> 4. After 1 hour, document the ending water level <br /> measurement. <br /> S. Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6 .7 , and <br /> dry the inside of the spill bucket before returning Plumber's Plug In <br /> I <br /> t to service. Tank Riser Pipe <br /> 6 . 2.6 Pass/Fail Criteria. If the water level has <br /> dropped less than 1/8 (0. 125 ) inch, the spill bucket <br /> passes the integrity test. <br /> If the water level has dropped 1 /8 (0. 125) inch or <br /> greater, the spill bucket fails the integrity test. <br /> 6.3 Spill Bucket Integrity Testing — Vacuum Test FIGURE 6-2. The cover must make a tight sea/ with the <br /> Method . spill bucket to prevent leakage when the vacuum Is <br /> 6 .3 . 1 Purpose . This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pri- <br /> mary containment of secondarily contained spill WARNING• Use only an air-operated vac- <br /> buckets , uum source or a vacuum pump pow- <br /> 6.3 .2 Description of Test. Using a specially ered by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pei .org <br />
The URL can be used to link to this page
Your browser does not support the video tag.