Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection 0 36 Month Inspection <br /> i . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 5/6/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Buslness As) <br /> Tesoro # 68153 <br /> Business Site Address City ZIP Code <br /> 2448 W . Kettleman Ln . Lodi 95242 <br /> 11 . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification) Phone # <br /> Rey Hernandez 1 (916 373- 1166 <br /> Contractor 1 Tank Tester license ;FICC Certification # ICC Certification Expiration pate <br /> 617238 8712763 5/8/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> Phase 1 EVR - CERT # 0154742 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> inspection Method L] Manufacturer Guidelines (Specify): OPW Install & Maintenance Guidelines <br /> Used: <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> ❑ Engineered Method (Specify): <br /> Attach the Inspection procedures and all documentation required to determine the results. <br /> # of Attached Pages <br /> TANK ID : (By tank number, storedproduct, etc.) Gasoline -87 Gasoline - 91 Diesel <br /> What is the tank Inside diameter? (Inches) 91 . 625 " 91 , 625" 91 . 625 " <br /> Is the fill piping secondarily contained? E Yes [I No R1 Yes E01 No Yes ❑ No ❑ Yes El No <br /> Is the vent piping secondarily contained? Z Yes El No Rl Yes ❑ No (] Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) Franklin Fuelin Franklin Fueling Franklin Fueling <br /> EBW BBw EBw <br /> What is the overfill prevention equipment response R Shuts Off Flow iM Shuts Off Flow M Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? El Restricts Flow ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) <br /> ❑ AN Alarm D AN Alarm ❑ AN Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes ❑R No ❑ Yes 0 No ❑ Yes [A No ❑ Yes ❑ No <br /> At what level in the tank Is the overfill prevention set 82 25 „ $2 25 " 82 25u <br /> to activate? (inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the 95% 95 % 95 % <br /> overfill prevention equipment activates? <br /> is the overfill prevention in proper operating condition ❑R Yes ❑ Yes :01 Yes ❑ Yesto respond when the substance reaches theappro date level? ❑ No (Specify in V.) ❑ No (Specify in V.) No (Specify in V.) ❑ No (Specify in V.) <br /> iV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results El Pass ❑ Fail [g] Pass ❑ Fail D ass ❑ Fail I ❑ Pass ❑ Fall <br /> V. COMME14TS <br /> Any items marked "Fair must be explained in this section. Any additional comments may also he provided here. <br /> Replaced 91 SC , and 87 ,91 and Diesel drop tubes . Performed tightness testing on all drop tubes with passing results . <br /> performed pressure decay test with passing results . No audio/lfisual on site <br /> Vi . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS iNSPECTiON <br /> 1 hereby certify that the overfill prevention equipment was inspected in accordance with California Cade of Regulations, Title 23, <br /> Division 3 , Chapter 16, Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> if the facility has more mponents than thf rm accommodates, additional copies of this page maybe attached. <br /> CERS = Carifomla Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, [GO = Internal onal Code Council, AN = Audible and Visual <br />