Laserfiche WebLink
i <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of s) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. N NA <br /> Y❑ <br /> Ell El <br /> Are the visual and audible alarms operational? <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ ❑ <br /> functional) tested , and confirmed operational? ❑ ❑ <br /> Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? 2, ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? Q ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? Q ❑ ❑ <br /> dary containment monitoring system tails to operate or is electrically <br /> Does the turbine automatically shut down if the piping secon ❑ ❑ <br /> disconnected? <br /> Does the turbine automaiically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) X❑ sump Q Under=Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, Is all communications equipment (e .g . , modem) operational? ❑ ❑ Q <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X . IN TANK <br /> GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) y N NA <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br /> This section must be completed if in-tank gauging is used to perform leak detection monitorings ❑ ❑ El <br /> asall input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for X <br /> round faults? freely , functi <br /> ❑ ❑ ❑ <br /> Were all in•tank gauging probes visually inspected for damage and residue buildup to ensure that floats move onally X <br /> tested , and confirmed operational? ❑ ❑ <br /> Was accuracy of system's product level readings tested? ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> For any answer of "N" above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />