Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page 2 of s) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Owens Corning A x❑ Pi Bx❑ I CxQ D <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑x Industry Code or Engineering Standard (Specify) : PEI / RP1200 - 17/ Fiberglass Tank/- 10" Hg . 2 Hours <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Underground Storage Tank Tester License #90- 1120 1 12/31 /2019 <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Tank A is a 10K, designated for Race 100 Octane Gasoline . <br /> Tank B is a 1 OK, designated for Super 91 Octane Gasoline . <br /> Tank C is a 12 K , designated for Regular 87 Octane Gasoline . <br /> Tank D is a 20K , designated for Clear Diesel #2 . <br /> i <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith FRP Aix B ❑x CD D ❑x <br /> A ❑ B ❑ C ❑ D ❑ <br /> Ei Test Method Used : ❑ Manufacturer Guidelines (Specify): <br /> ❑x Industry code or Engineering standard (specify) : PEI / RP1200 - 17/Fiberglass Pipe/5 Psi 1 hour <br /> F ❑ Engineered Method (Specify): <br /> Ii <br /> # of Attached Pages <br /> i <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Underground Storage Tank Tester License #90- 1120 12/31 /2019 <br /> Interstitial Communication Verification Method Used : <br /> Release pressure at end of Piping Runs at UDC's and Filter Pit Sump , where applicable . <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> Note : Product Piping Containment for the Diesel Tanks is manifolded together and plumbed from the Diesel <br /> Turbine/Product Piping Sumps to the West Wall of the Filter Pit Sump . Then The Diesel Product Piping Containment is <br /> plumbed from the East Wall of the Filter Pit Sump to supply the Diesel Fuel Islands Master Dispensers . Test point is at <br /> UDC #5&6 back to Seal off Boot at East Wall of Filter Pit Sump . <br /> ID = Identification <br />