My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 1:31:59 PM
Creation date
9/16/2020 9:29:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0540987
PE
2351
FACILITY_ID
FA0023459
FACILITY_NAME
Pilot Travel Center Lathrop - 1017
STREET_NUMBER
345
STREET_NAME
ROTH
STREET_TYPE
Rd
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
345 Roth Rd
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging / SIR Equipment : -x Check this box if tank gauging is used only for inventory control . <br /> :1 Check this box if no tank gauging or SIR equipment is installed . <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring . <br /> Complete the following checklist : <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination , including testing for ground faults? <br /> Li Yes a No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested ? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected . <br /> G . Line Leak Detectors ( LLD) : © Check this box if LLDs are not installed . <br /> Complete the following checklist : <br /> Cx Yes ❑ No* For equipment start-up or annual equipment certification , was a leak simulated to verify LLD performance ? (Check all <br /> ❑ N/A that apply) Simulated leak rate : 03 g . p. h . ; [EJ0 . 1 g . p. h ; [JO . 2 g . p. h . <br /> Lx Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Cx Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Lx Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak? <br /> ix N/A <br /> ❑ Yes ❑ No* For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> [8 N/A disconnected ? <br /> ❑ Yes ❑ No* For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> 1k N/A fails a test? <br /> u Yes u No* For electronic LLDs , have all accessible wiring connections been visually inspected? <br /> ix N/A <br /> rx Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H , below, describe how and when these deficiencies were or will be corrected . <br /> H . Comments : <br /> Replaced Like For Like Al MLLD ,n Retested And Was Able To Pass No Permit Required . <br /> Inspector on site to witness test . <br /> Old SN : 17051149 <br /> New SN : 18031476 <br /> Monitoring System Certification Page of 12/07 <br /> I <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.