Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection Z 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10726990 10/ 11 /2018 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Pilot 1017 <br /> fuslne s. ifelQg4ut9� <br /> zit' Code <br /> �45 ` f oli , fo d ' _ 77T!Lathrop. 95330 - <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN <br /> INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICG Certification.) Phone # <br /> Rogello Valencia ( 888 ) 972 -7581 <br /> IIIIIIIIqq <br /> Contractor I Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 804431 825764MT 4/20/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> OPW #167223 Exp . 1 /19/20 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : Step by step instructions on measurements and how to cut . <br /> Used : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> v*of Atteched Wages , <br /> Attach the Inspection procedures and all documentation rogn1rod to dateftinb the results. ` 4 <br /> `rAIJK .II) : (By tank ndi lber, stored product, etc.) IT# 2 91 <br /> What is the tank Inside diameter? (inches) 120" <br /> is the fill piping secondarily contained? Yes ❑ No d Yes ❑ No ❑ Yes t] No [1 Yes 0 No <br /> Is the vent piping secondarily containe ? M Yes ❑ No d Yes ❑ No CI Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) opw oPw <br /> What is the overfill prevention equipment response Z Shuts Off Flow I] Shuts Off Flow ❑ Shuts Oft Flow ❑ Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) E] Restricts Flow ❑ Restricts Flow ElRestricts Flow ElRestricts Flow <br /> EJ AtV Alarm ❑ AIV Alarm ❑ AN Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes [E] No ❑ Yes FRWI No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> 1061 /8 1067/8 <br /> to activate? (Inches from bottom of tank.) <br /> E' <br /> i. What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 95 % 95 % <br /> Is the overfill prevention in proper operating condition I ❑x Yes 0 Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑ No (Specify in V) ❑ No (Specify in V) ❑ No (Specify in V) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> IIIIIIIIN <br /> Overfill Prevention Inspection Results ❑x Pass ❑ Fail Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here . <br /> Site equipped with OPW drop tube overfill prevention set at 95% <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3, Chapter 16, Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Cai'ifomia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AN = Audible and Visual <br />