My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 9:09:31 AM
Creation date
9/16/2020 10:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time In: <br /> Time Out: <br /> oPa�tN. San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, CA95205-6232 <br /> ca .... ..�;;P Telephone:(209)468-3420 Fax: (209)464-0138 Web:www.sjgov.org/ehd <br /> LlFOR <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: REGIONAL TRANSPORTATION CENTER Date: 04/02/2019 <br /> Address: 2849 E MYRTLE ST , STOCKTON 95205 <br /> Requestor: JOSEPH BAGLEY, BAGLEY ENTERPRISES INC Telephone: (209) 367-4800 <br /> Program Element: 2308- UST RETROFIT Request#: SR0079170 <br /> Inspection Type: 298- UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Joe Bartholdi ICC Service Tech/Installer Exp. Date: 11/08/2020 <br /> Manufacturer training: CSI, 03/13/20; NOV,02/14/22 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> Witnessed primary pressure testing and soap testing of the diesel DT-2 piping in the transition sump at 46 psi for 60 minutes. <br /> Passed. <br /> Witnessed brine filling of the DT-2 diesel STP sump, the DT-1 diesel STP sump, and the DT-1 diesel fill sump. Verified proper <br /> manufacturer's brine was used and brine communication. <br /> *This facility is NOT approved for operation. Additional inspections are needed. See the approval letter dated August 15, 2018 <br /> for a list of required inspections. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code. If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Eric Molgaard, Service Technician <br /> EH Specialist: STACY RIVERA Phone: (209)468-3440 <br /> FA0022301 SR0079170 SC298 04/02/2019 <br /> EHD 23-01 Rev.06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.