Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES X NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove and replace like for like veeder root smart sensors on s1 , s2 , s3 , s4 , and s5 . Test with county upon <br /> completion of repair. <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> veeder root smart sensor (5gty) <br /> VRM30020463 <br /> EH230038 (revised 12-1 1 -1 5) 3 <br />