My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:47:23 AM
Creation date
9/16/2020 2:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AM PM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM <br />VI. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N <br />N/A <br />Was a leak simulated to verify LLD performance? ❑ <br />(Check all that apply.) Simulated leak rate verified: ❑ 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />❑ <br />❑ <br />Was the test apparatus properly calibrated? <br />❑ <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ <br />❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑ <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />❑ <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a ❑ <br />test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />❑ <br />❑ <br />❑ <br />For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br />VII.COMMENTS <br />N/A <br />VIII. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br />❑ Check this box if VPH Monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component)s) Monitored By This Sensor Sensor Functionality <br />Test <br />Interstitial <br />Communication Test <br />S1 87 product ® Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S2 91 product ® Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S3 Vent Gas ® Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S4 91 vapor ® Pass ❑ Fail <br />I ❑ Pass <br />❑ Fail <br />S6' DSL vent ® Pass ❑ Fail <br />I ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />1 ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />1 ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />I ❑ Pass <br />❑ Fail <br />❑ Pass Fail <br />Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />1 ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />I ❑ Pass <br />❑ Fail <br />❑ Pass L] Fail <br />I E] Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space <br />❑ Other (Describe the method in Section XV below.) <br />❑ Visual Inspection <br />❑ Gauge <br />Was the vacuum or pressure restored to operating levels in interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br />IX. COMMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.