My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3434
>
2300 - Underground Storage Tank Program
>
PR0232398
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 12:59:50 PM
Creation date
9/17/2020 11:51:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232398
PE
2361
FACILITY_ID
FA0003681
FACILITY_NAME
STOCKTON AUTO CENTER CAR WASH
STREET_NUMBER
3434
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12802011
CURRENT_STATUS
01
SITE_LOCATION
3434 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 11/5/2019 <br /> If you already have a site plan that shows all required information,you may include it,rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring ventAransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> MoILkoHng Sydem CorNHoation <br /> USTMoaitorinp Sit*Plan <br /> SiteAddret= CALIFCRNV-CAF WASH-ZOOM 3434 E.HAMMER LAND STOCKTON CA 95212 <br /> pay <br /> F=FILLS <br /> T=TL-RBI-NI <br /> ---. P=PROBE <br /> S-SL'NIP STVSOR <br /> L=Leak Detector <br /> ?4I-AIaa..•a.• A'JEF F4L _ <br /> B=Brine Sensor <br /> I=Smart Sonror <br /> S=STP E-STOP.. A <br /> C=Floats&Chain: T <br /> E=ES.P G <br /> ,L.wo <br /> C <br /> t: <br /> n' <br /> A <br /> S <br /> OIL4 H <br /> CI A\GI - ' <br /> SHOP <br /> . - <br /> P <br /> I <br /> KE . . . . . . . <br /> +PIPrgC-* F=FILLS x s <br /> (UMMS) T=TCRI INE <br /> DrarirL-of P=PROBE c <br /> pici—_ <br /> ext 0. C= LT\EPR l x <br /> s.v and LMIC'a. =SLIP S1 SOF r <br /> NoexLc---d L=Leak Detector <br /> da-uir a b1=_liana`' i A <br /> aconite.-.•e B=Brine Sensor <br /> cannot spxt:Larz I=Smart Sensor <br /> S=STP d?KL Leix,u.a'ae—goundrAw awe norvisible to the rerftiwi _e arckn dan are a <br /> blu ptim. C-FlontcA Chau.: Dr—ir{s <br /> E=E Stop nw to scale <br /> Dare mar-was d*aeon'11120!2017 <br /> Irctructianc <br /> If you already have a diagram that shows all required informationyou may include m rather than this page,with your Monitoring System Certification. On your sae plan. <br /> a n M tre;enera!payout of tanks aro piping. ciearry Mentrry Iocancns or ne rolbwing equ�pment,r instated:rnonnorng sys-em cdntrm panels;sensors mornonnr ianx <br /> anrular spaces,sumps,dispenser Dans,spill contains,or other secondary containm cant areasmechar,cal or ele^=rcnic line leak detecbrs;and in-tank liquid levet <br /> probo.(iFucod rarsaal.deioct•C . In theacace-pravacd,nate tho3atcehic Sit.Pfanwoe p-pared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.