My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:46:32 AM
Creation date
9/17/2020 1:41:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUEL MANAGEMENT SYSTEMS r <br /> Franklin Fueling Systems I TANK GAUGE CONSOLES <br /> Specifications - continued <br /> Capabilities Connectivity <br /> •Inventory and delivery management . Ethernet/complete web interface <br /> •Leak detection sensors ■ RS-232/485 <br /> •Static and Continuous tank testing •USB <br /> •Static and Statistical Electronic Line Leak Detection a Fax/data modem <br /> • High,low and water alarm set points • Lon-via Echelon <br /> •Inventory reconciliation/tank autocalibration <br /> • Density and mass measurement DEF/AdBlue® <br /> •Secondary Containment Monitoring (vacuum) • Recirculation capabilities for DEF/AdBlue®applications <br /> including pump activation/deactivation based on <br /> •Turbine Pump Interface (TPI) temperature sensor data with time and duration <br /> • Email notifications condition customization options. <br /> • Back-up generator monitoring/fuel flow control <br /> .MODBUS®compatibility <br /> —Ordering Information <br /> TS-550 evo <br /> Description <br /> T550ED T5-550 evo base console without printer <br /> T550EDP I TS-550 evo base console with printer <br /> TS-5000 evo <br /> Description <br /> 5000ED TS-5000 evo base console without printer <br /> T5000EDP TS-5000 evo base console with printer <br /> Expansion Console <br /> Description <br /> EVO-EXPC Secondary console to add eleven additional plug-in modules to the primary TS-550 evo console, <br /> comes without a display or printer <br /> EVC-EXPC2 Secondary console to add six additional plug-in modules to the primary TS-550 evo console, <br /> comes without a display or printer <br /> T5-550 evo and TS-5000 evo Console Hardware and Software Options <br /> TS-550/5000 evo consoles come standard with the ability to perform in-tank static leak detection.The following software <br /> and hardware options can be added to customize your console.The internal hardware options will be factory installed <br /> when ordered with the console. <br /> Internal Hardware Options <br /> DescriptionModel I <br /> EVO-DIMiB (1)Internal dispenser interface module,dispenser interface cable must be ordered separately <br /> EVO-LON (E)LonTm communication module,IFSF protocol capability <br /> TS-MDMIB (M)Internal modem,includes fax and data software capability <br /> Note:Only one EVO-DIM or EVO-LON module can be installed per console. <br /> Internal Software Options <br /> .. Description <br /> TS-TT (T)Statistical Continuous Automatic Leak Detection,24 hour continuous tank testing software <br /> TS-TRAC (R)Tank inventory reconciliation and autocalibration <br /> TS-ELLD (L)Electronic line leak detection <br /> TS-SCM (S)Secondary containment monitoring <br /> TS-CON (C) DEF/AdBlue°recirculation,scheduling,and timer conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.