My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:46:32 AM
Creation date
9/17/2020 1:41:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N.,J OAQ U I N Environmental Health Department <br /> — COUNTY--- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of pians&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES N NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the'Site Health and Safety Plan'Is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repalrs and/or replacements. If repairing a component,describe <br /> how this will be done. (If Ro ng pipfng, UDC's, or other LIST equipment, or performing tank top upgrade, <br /> use the UST Installation Applicatlon pages 4-8 as necessary for a timely pian review): <br /> INSTALL ELLD WITH STAND-ALONE MONITORING,ON EXISTING GENERATOR SYSTEM <br /> LOCK OUT/TAG THE POWER TO THE EXISTING TURBINES. <br /> REMOVE THE EXISTING TURBINE RELAYS. <br /> INSTALL TWO NEW FRANKLIN FUELING SMART TURBINE CONTROLLERS. <br /> INSTALL NEW INCON STAND-ALONE ELECTRONIC LINE LEAK MONITORING PANEL WITH PRINTER,MODEM AND ELLD SOFTWARE. <br /> INSTALL NEW REMOTE ALARM WITH ACKNOWLEDGEMENT SWITCH. <br /> INSTALL ONE INCON EXPLOSION PROOF ELECTRONIC LINE LEAK DETECTOR(ELLD)FOR EACH TURBINE. <br /> MODIFY THE CONDUIT TO EACH TURBINE TO ADD A JUNCTION BOX,PULL TURBINE POWER CONDUCTORS,AND DATA CABLE FOR <br /> THE ELLD. <br /> COMMISSION THE NEW ELLD SYSTEM FOR PROPER OPERATION AND CERTIFICATION. <br /> 4. List of equiprnentto be used(Attach manufacturer's specification sheets showing third-party approval): <br /> INCON EVO MONITORING SYSTEM,DISPLAY,PRINTER,MODEM,FRANKLIN FUELING T55DEDPM <br /> ELLD I-PRODUCT LINE EXPLOSION PROOF TRANSDUCER KIT.FRANKLIN FUELING TS-LS500E/2 <br /> SUBMERSIBLE TURBINE PUMP-SCI SINGLE PHASE SMART CONTROLLER.INCON STP-SCI <br /> LOGIC PANEL.FRANKLIN FUELING TS-CON&TS-ELLD/G <br /> OVERFILL.ALARM AND ACKNOWLEDGEMENT SWITCH.INCON TS-RA1&TS-RK <br /> 5. Decontamination Procedures. <br /> a. Will piping be decontaminated prior to removal? YES j 1 NO[] <br /> b. Identify contractor performing decontamination: <br /> Name N/A Phone <br /> Address City Zip <br /> 3010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.