Laserfiche WebLink
- 2 - <br /> Community Development Department <br /> PA - 1900182 ( UP ) <br /> 3 . An encroachment permit shall be required for all work within road right- of-way . ( Note : Driveway <br /> encroachment permits are for flatwork only — all vertical features , including but not limited to <br /> fences , walls , private light standards , rocks , landscaping and cobbles are not allowed in the right- <br /> of-way . ) ( Development Title Sections 9 - 1145 . 4 and 9 - 1145 . 5 ) <br /> 4 . The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Improvement Standards Drawing No . R - 17 prior to issuance of the occupancy permit . <br /> ( Development Title Section 9 - 1145 . 5 ) <br /> 5 . The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record . <br /> ( Resolutions R- 00 -433 ) <br /> 6 . The Regional Transportation Impact Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . ( Resolution R - 06 -38 ) <br /> 7 . This project falls within the definition of a Priority Project as defined in either the County " Storm <br /> Water Quality Control Criteria Plan " ( SWQCCP ) or the County Phase II National Pollutant <br /> Discharge Elimination System ( NPDES ) permit and shall comply with the following conditions : <br /> a ) A registered professional engineer shall design a system or combination of systems to <br /> treat , filter or infiltrate the 85th percentile storm as defined in the County ' s Post- <br /> Construction 2009 SWQCCP . The system design shall follow standards as outlined in the <br /> 2009 Storm Water Quality Control Criteria Plan and comply with the conditions of the <br /> County Phase I NPDES permit . Plans and /or calculations of the proposed system shall be <br /> submitted to the County for review and approval prior to clearance for plan check . <br /> b ) Applicant shall submit a " Storm Water Pollution Prevention Plan " (SWPPP ) to Public Works <br /> for review . A SWPPP preparation guide is available at the Department of Public Works . A <br /> copy of the approved SWPPP and all required records , updates , test results and inspection <br /> reports shall be maintained on the construction site and be available for review upon <br /> request . The post construction chapter of the SWPPP must identify expected pollutants <br /> and how they will be prevented from entering the storm system . The chapter shall also <br /> contain a maintenance plan , a spill plan , and a training plan for all employees on proper <br /> use , handling and disposal of potential pollutants . <br /> c) Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system . The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors . . <br /> d ) A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County will be required for the owner/operator of stormwater controls prior <br /> to the release of the building permit . <br /> AC : CH <br /> 2 of 2 <br />