My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 3:49:48 PM
Creation date
9/17/2020 2:46:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
FACILITY_NAME
Super Store Industries - Grocery Division
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAti!?Tentat Heath Dep2rt!'•ent <br /> N MAKIN <br /> rouN!T*,< <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES(I NO* <br /> 2. Submit copies of ICC Service Technician and/or installer's certficate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan"is available on the jobsite as required by Title S. <br /> 3. Detailed description of work to be completed_ List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing locationof repairs and/or replacements_ If repairing a component, describe <br /> how this will be done. (if adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> � J <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 1 r v L Sr�?„ t~rd,,rA &oo - <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. identify contractor performing decontamination_ <br /> Name Phone(�_} <br /> Address City Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.