Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection Fx1 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 3/6/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> California Stop <br /> Business Site Address City ZIP Code <br /> 2224 S Manthey Rd TStockton , CA 95026 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Brian Dunahay (415) 315 -9638 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 956593 8021436-UT 122/16/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> Overfill Cert : PEIRP1200 10/9/2018 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION - , <br /> Inspection Method ❑ Manufacturer Guidelines (Specify) : <br /> Used : <br /> ❑ Indust ryCode or Engineering Standard (specify) <br /> RP1200 <br /> I <br /> ❑ Engineered Method (Specify): <br /> Attach the inspection procedures and ail documentation required to determine the results. # of Attached Pages <br /> TANK ID : (By tank number, storedproduct, etc.) 87 91 Diesel <br /> What is the tank inside diameter? (Inches) 92 <br /> Is the fill piping secondarily contained? ❑ Yes ❑ No ❑ Yes 0 No ❑ Yes El El Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑ Yes ❑ No ❑ Yes ❑x No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) OPW <br /> What is the overfill prevention equipment response ❑ Shuts Off Flow ❑x Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) [IRestricts Flow ElRestricts Flow ElRestricts Flow [:1Restricts Flow <br /> ❑ AN Alarm ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 82 . 00 <br /> What is the percent capacity of the tank at which the 94 <br /> overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating condition ❑ Yes ❑x Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑ No (Specify in V) ❑ No (Specify in V.) ❑ No (Specify in V.) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑ Pass [] Fail Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> 87 and Diesel were tested and passed on 1 /16/2019 . <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> 1 hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3, Chapter 16 , Section 2637 . 2 and all the information contained herein is accurate . <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AA/ = Audible and Visual <br />