Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action F] installation Inspection El Repair Inspection 0 36 Month Inspection <br /> 1 . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10182043 5/31 /2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> EL DORADO GAS MART <br /> Business Site Address City ZIP Code <br /> 1605 S . EL DORADO ST TSTOCKTON __. 95206 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Edward Stearns (209 ) 744-0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex . 09/30/2020 8883080- UT 11 /9/2020 <br /> Overrill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , Phil-Tite & EVR Phase 1 1009893708 Ex 11 /29/2020 OPW 104-635 Ex 3- 14-2020 <br /> Emco 3205 Ex . 11 / 16/2020 ATG : VR A31048 Ex. 8/9/ 19 Incon 1009893708 11 /30/2020 <br /> 111 . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : REMOVE AND INSPECT <br /> Used : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages4 <br /> TANK ID : (By tank number, stored product, etc.) 87 91 <br /> What is the tank inside diameter? (Inches) 127 . 50 127 . 50 <br /> Is the fill piping secondarily contained? ❑ Yes ❑x No ❑ Yes ❑x No ❑ Yes ❑ No ❑ Yes ❑ No <br /> EIs the vent piping secondarily contained? ❑ Yes N No ❑ Yes 0 No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) OPW OPW <br /> 61 SO 61 SO <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow Z Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> (Check all that apply) <br /> El Restricts Flow [:1Restricts Flow ❑ Restricts Flow El Restricts Flow <br /> ❑ A/V Alarm ❑ AIV Alarm ❑ A/V Alarm ❑ AIV Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes ❑x No ❑ Yes 0 No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set 115 115 . 2 <br /> to activate? (Inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 94 . 9 94 . 8 <br /> Is the overfill prevention in proper operating condition ❑x Yes Z Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level ? ElNo (Specify in V.) 1771No (Specify in V) ElNo (Specify in V) ElNo (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 0 Pass ❑ Fail Z Pass ❑ Fail [:] Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> RA i 1 FJ <br /> A; <br /> :J <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING TW § INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3 , Chapter 16 , Section 2637 .2 and all the information contained herein is a _ , <br /> UST Service Technician Signature , , . ARTMENT, <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> = Audible and Usual <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AN <br />