Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM <br /> Type of Action ❑ Installation Test ❑ Repair Test X 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10181885 01 /04/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As.) <br /> VALLEY PACIFIC LODI PLANT & CARDLOCK <br /> Business Site Address City ZIP Code <br /> 931 E Victor Ave . Lodi 95240 <br /> 11 , UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Garrett Warren 1 ( 916 ) 991 - 1100 <br /> Contractor/Tank Tester License # ICC Certification it ICC Certification Expiration Date <br /> CSLB#803616 SWRB#06 - 1672 8185019 10-2-2019 41 Nam <br /> Spill Container Testing Training and Certifications (List applicable certifications) I <br /> OPW EVR 101018 exp . & 9 -2019 1 p <br /> III , SPILL CONTAINER TESTING INFORMATION FEBX19 <br /> Test Method <br /> Used : E] Manufacturer Guidelines: <br /> (Specify) <br /> X Industry Code or Engineering Standard : RP 1200 , { T { yk n `a RAF 4 <br /> (Specify) <br /> ❑ Engineered Method : <br /> (Specify) <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank ID : (By tank number, stored product, etc.) T6 : 87 UNL T7 : 87 UNL <br /> Spill Container Manufacturer: OPW OPW <br /> 9 Non -Metallic M Non -Metallic ❑ Non-Metallic ❑ Non-Metallic <br /> Method of Cathodic Protection <br /> 0 Isolation IN Isolation ❑ Isolation ❑ Isolation <br /> ❑ Other ❑ Other ❑ Other ❑ Other <br /> (Specify in section V.) (Specify in section V,) (Specify in section V) (Specify in section V.) <br /> Inside Diameter of Spill Container: (Inches) <br /> Depth of Spill Container: (Inches) <br /> Does the spill container have a 5 gallonEI Yes ❑ No a Yes ❑ NorEE11es ❑ No ❑ Yes El <br /> capacity? <br /> IN Drain Valve IN Drain Valve ❑ Drain Valve ❑ Drain Valve <br /> Method to Keep Spill Container Empty ❑ Onsite Pump ElOnsite Pump ElOnsite Pump ❑ Onsite Pump <br /> ❑ Other ❑ Other ❑ Other ❑ Other <br /> (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results X Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked "Fail" above must be explained in this section. Any additional comments may also be provided here. <br /> The T7: UNL bucket failed . It originally spun in the ground during the OPI inspection . Bucket will be replaced and tested at a later date. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section <br /> 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than thts forff accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council <br />