Laserfiche WebLink
S Q IV J o Q Q U ( N Environmental Health Department <br /> COUNTY Linda Turkatte , REHS , Director <br /> f. ss rr o �F�. s fere . <br /> Kasey Foley, REHS, Assistant Director <br /> revtr <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu, REHS <br /> Michael Kith , REHS <br /> April 08 , 2019 <br /> MARTY WEITHMAN <br /> SERVICE STATION SYSTEMS , INC . <br /> 680 QUINN AVE <br /> SAN JOSE , CA 95112 <br /> Re : CRUISERS MANTECA #29 SR0080312 <br /> 1137 W LATHROP RD <br /> MANTECA, CA 95336 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the application for <br /> a permit to make fiberglass repairs on the 91 -octane double wall STP Bravo sump (with concrete breaking ) on the <br /> underground storage tank ( UST) system at the above noted address . No penentration repair or replacement was <br /> proposed . The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones . <br /> 3 . Contact Elena Manzo at (209) 953-7699 to arrange the following appointments (a 48-hour notice is <br /> required for inspection appointments) . <br /> Sump test: Integrity testing of repaired 91 STP sump per the manufacturer's installation instructions <br /> • prior to backfill (a copy of installation instructions shall be present onsite at the time of inspection) . <br /> Brine addition : brine type verification and brine addition (all manufacturer required brine filling devises must be <br /> present onsite and utilized during brine filling ) . Brine communication verification (91 STP sump) . <br /> • Sensor functionality: Functionality of the monitoring system (91 STP sump brine and annular sensors) <br /> must be verified to ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code . If it is determined that a cold start is <br /> necessary , a copy of the alarm history shall be printed prior to performing the " cold start" of the <br /> monitoring system and made available at the time of EHD inspection . <br /> Please be aware that the facility cannot operate the 91 -octane tank prior to the EHD inspection and <br /> approval . <br /> 4 . Since concrete will be broken near the 91 -octane tank, the integrity of its secondary containment must be <br /> verified once concrete is poured in accordance with the manufacturer's guidelines . <br /> 1868 E . Hazelton Avenue Stockton , California 95205 T 209 468-3420 F 209 464-0138 1 www. sjcehd . com <br />