Laserfiche WebLink
Shill Bucket Testing Report <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO AM PM#83230 Date of Testing: 10/22/2019 <br /> Facility Address: 1340 W.Colony Rd.Ripon,CA 95366 <br /> Facility Contact: Ranjeet I Phone: (209)579-4014 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services,Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License# 1005444 ICC Certification .j 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Nleasure Equipment Resolution: 1/16" <br /> Identify Spill Bucket (4v Tank Tl: 87 M Nest Fill T1: 87 ivi East Fill T2: 91 Fill T3: Diesel Fill <br /> Number, Slored Product etc.) <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter' 11 '/4" 11 'h" 11 '/4" 11 '/4" <br /> Bucket Depth: 16" 15" 16" 16'/4" <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 1:15 P.M. 1:20 p.tn. 1:20 p.m. 1:25 p.m. <br /> Initial Reading(Rt): 14 '/4" 14 1/8" 15 1/8" 15 5/8" <br /> Test End Time(TF): 2:15 p.m. 2:20 p.m. 2:20 p.m. 2:25 p.m. <br /> Final Reading(RF): 14'/4" 14 1/8" 15 1/8" 15 5/8" <br /> "rest Duration(TF—Tt): 1 hr 1 hr I hr 1 hr <br /> Change in Reading(Rr•-Ri): 11 0 0 0 0 <br /> Pass/Fail Threshold or 118" 1/8" ! 1/8" 1/8" <br /> Criteria: <br /> Test Result: x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail <br /> Comments: <br /> Technician's Signature: Date: 10/22/2019 <br />