My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 10:06:34 AM
Creation date
9/18/2020 9:28:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI INC
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ( LLD ) are NOT installed . (Do not complete this section .) Y N N/A <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance ? ® ❑ ❑ <br /> (Check all that apply. ) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0. 2 GPH <br /> Was the test apparatus properly calibrated ? FE <br /> 11El <br /> emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? El <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? FlE <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected ? ❑ ElFor electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or ❑ ❑ <br /> disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a ® ❑ ❑ <br /> test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? E ❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? E ❑ I ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? E ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM/ PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH Monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type ( Mark all that apply. ) ® Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component) s) Monitored By This Sensor Sensor Functionality Interstitial <br /> Test Communication Test <br /> S1 87 Product ® Pass ❑ Fail ® Pass ❑ Fail <br /> 52 87 Annular ® Pass ❑ Fail ® Pass ❑ Fail <br /> S3 87 Vent ® Pass ❑ Fail ® Pass ❑ Fail <br /> S4 91 Product ® Pass ❑ Fail ® Pass ❑ Fail <br /> S5 91- DSL Annular ® Pass ❑ Fail 1 ® Pass ❑ Fail <br /> 56 DSL Product ® Pass ❑ Fail ® Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ® Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in Section XV below. ) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in interstitial spaces? ® Yes ❑ No ( Describe the reason in section XV below . ) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV . COMMENTS <br /> r <br /> HE <br /> E <br /> r HIPAH IL <br /> . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.