My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 8:49:58 AM
Creation date
9/18/2020 1:55:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation, Operation, and Maintenance Manual, Page 74 Executive Order VR -102-Q <br />®Registered T.M. as Owens Corning Fiberglass Corporation ASSEMBLY INSTRUCTIONS <br />I 1111 1111 111 11 11111 1111 11111 1 1 11 <br />Tape measure <br />Riser <br />Pipe ( ) <br />with To Tank. ( ) <br />Face Top To <br />peal Ada ptor <br />Tank <br />Bot om <br />EXAMPLE <br />1) For an Owens-Corning Model G-3 Fiberglass® Tank <br />Calibration Chart: <br />Tank Capacity as 10,000 gal., nominal 9,403 gal. <br />NOTE: Use actual capacity only <br />2) 95% of actual tank capacity = 0.95 x 9403 gal. _ <br />8933 gal. <br />3) The closest numberwhich is less than 8933 gala Is <br />8910 gal. Choosing the closest number less than <br />95% of actual capacity ensures that the initial <br />shutoff will occur when the tank is no more than <br />95% full. <br />4) The calibration chart reading of 8910 galcorre- <br />sponds to a dipstick measurement of 82". <br />5) Dipstick number (X) = 82" <br />Tank diameter (Y) = 92" <br />(Y) (X) _ (Z) (92" 2" =10'") <br />(Z) = 10" <br />6) (Z),-2 =C (10°-2"=8") <br />C=8" <br />7) Is 8" less than 6-1 <br />NO Measure the distance from the top of the FSA- <br />40pFace Seal Adaptor installed on the riser pipe <br />to the inside, top lip of the storage tank and <br />obtain measurement (A). <br />Upper tube length = C + (A) <br />IMPORTANT: Each of the numbered steps in the instal <br />lation instructions are designed as a CHECK LIST to en- <br />sure proper installation and trouble free operation of the <br />W61 SO Overfill Prevention Valve. <br />Read and follow these steps carefully, checking them off <br />as you proceed. <br />Figure numbers correspond to step numbers for easy <br />reference. <br />STEP 1: MEASURE <br />Install the OPW Face Seal Adaptor and the OPWThread- <br />on Spill Container on the Fill Riser (Refer to the Installa- <br />tion Instructions Supplied with the Spill Container). In- <br />sert a tape measure through the riser pipe and hook it <br />under the inside of the tank in the lengthwise direction. <br />Measure the distance from the top of the Face Seal <br />Adaptor threads inside the base of the spill container <br />bucket just below the drain valve outlet window to the <br />inside, top lip of the storage tank (Dim. "A") <br />(See Figure 1 &1A). <br />The top flange on the 61 SO will rest on the Face Seal <br />Adaptor just below the drain valve outlet, and be locked <br />in place between the Face Seal Adaptor and the 4" <br />nipple that is installed in the spill container with the <br />Jack Screw Kit (See Figure 1A). (For riser pipe configu- <br />rations other than that shown, consult installation <br />drawings or use other necessary means to measure Di- <br />mension "A"). <br />Using a tape measure, measure the distance from the top <br />of the Face Seal Adaptor in the spill container to the <br />bottom of the tank (Dim. '"B"). <br />IMPORTANT: Inspect the riser pipe for any foreign ma- <br />terial. Over spray from tank relining or any internal burrs <br />inside of pipe must be removed prior to installation. <br />Failure to have an unobstructed riser pipe may prevent <br />proper installation and operation of the valve. The 61 SO <br />is designed for installation into schedule 40 riser pipes. <br />The 61 SO cannot be installed into schedule 80 riser <br />pipes. <br />STEP2: MARKTHETUBE <br />Use the result from Step 1 and HOW TO LOCATE THE <br />POSITION OF THE61SOAT95% TANK CAPA CITYto <br />mark the upper tube. Measure the distance from the <br />point where the upper tube and valve body meet. For <br />"C" measurements greater than 6- 112" use tape <br />measure to mark the calculated upper tube length onto <br />the upper tube. <br />
The URL can be used to link to this page
Your browser does not support the video tag.