My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 8:49:58 AM
Creation date
9/18/2020 1:55:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation, Operation, and Maintenance Manual, Page 76 Executive Order VR -102-Q <br />STEP 7: DRILL HOLES <br />With the inlet tube in place, carefully drill (3) 1/8" diam- <br />eter pilot holes through the drop tube and inlet tube at <br />three locations at 120 degree intervals around the tube, <br />1 inch below the flange. Using the pilot holes, drill (3) <br />5/16" dia, holes through the tubes. Remove the burrs <br />from the drilling operation from the inside of the drop <br />tube assembly with a fine half round file. <br />IMPORTANT: A 5/16" drill bit must be used. Do not <br />substitute any other size drill bit. <br />Figure 7 <br />STEP 8: ASSEMBLE AND SEAL CLINCH STUDS <br />Loosely assemble the <br />three (3) clinch studs, lock <br />washers, and nuts in <br />holes. Do not tighten at <br />this time. Mix up a small <br />amount of sealant. Gen- <br />erously apply sealant un- <br />derneath each clinch stud <br />head, each nut, and on <br />the outside of the tube <br />around the holes. <br />Sur <br />Apply Sealant <br />T _= <br />-'r <br />Figure 8 <br />STEP 9: TIGHTEN SELF -CLINCHING STUDS <br />Tighten clinch studs securely with a Yi' wrench. Use <br />only the self -clinching studs that are supplied with the <br />unit. Seating torque is 11.5 ft-Ibs min. to 13.5 ft -lbs <br />max. Do not over tighten. Note: Failure to properly <br />apply and cure the sealant may result in a failure of a <br />pressure decay leak test. <br />STEP 10: LOWER TUBE ASSEMBLY <br />If a vise is used, clamp on the valve body casting only to <br />avoid damage to the float. Mix the remaining sealant <br />until the color is uniform. Using the mixing stick, gener- <br />ously apply sealant to the first 6 male threads on the <br />valve body as shown in figure 10. Make sure coverage <br />is completely around the threads, and work the sealant <br />down into the thread profile. Quickly thread the lower <br />tube onto the valve body. Tighten the tube securely by <br />hand or with a strap wrench. Remove excess sealant <br />and smooth sealant bead with water moistened mixing <br />IMPORTANT: Allow sealant (epoxy) to cure for 24 <br />hours before installing into tank. <br />_ npp;y Sealy, asn'Giete+y <br />a tvid NS! 611Fe3d5 <br />Figure 70 <br />NOTE: Before installing the valve in the tank, a pres- <br />sure test can be performed on the valve to check for <br />vapor tightness. Seal off both ends of the tube with <br />inflatable plumber's plugs. Apply a maximum 10" W.C. <br />(1I3 PSI) air pressure. If pressure does not hold and a <br />leak can be located with soap solution, do not install <br />the valve. Send the valve back to OPW for warranty <br />evaluation. Caution: Do not over -pressure. Excess pres- <br />e can damage the valve. <br />ST <br />ter <br />dra <br />EP 11: CUT LOWER TUBE AT 45 ANGLE <br />Measuring from the underside of the inlet tube flange, <br />mark the overall length of the drop tube a distance of <br />(B) minus 6" or as per local codes or requirements. De - <br />mine dimension (B) from the measurements taken in <br />Step 1, Figure 1 (Top of the Face Seal Adaptor below the <br />in valve outlet in the spill container to the bot- tom <br />of the tank). Saw off the excess tube at a 45- degree <br />angle, and file off any sharp burrs (Refer to Figure 16). <br />Optional: Install the OPW Tank Bottom Protector on the <br />lower tube (Refer to Installation instructions supplied <br />with the Tank Bottom Protector). <br />STEP 12: PREPARE FILL RISER FOR VALVE INSER- <br />TION <br />IMPORTANT: Inspect the riser pipe for any foreign ma- <br />terial. Over spray from tank relining or any internal <br />burrs inside of pipe must be removed prior to installa- <br />tion. Failure to have an unobstructed riser pipe may <br />prevent proper installation or operation of the valve. <br />Thoroughly clean top of riser pipe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.