My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 4:37:47 PM
Creation date
9/18/2020 2:54:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope <br /> This procedure will provide a Veeder- Root ATG certified technician a procedure to safely test tank overfill <br /> protection . <br /> Reference Documents <br /> x <br /> • Veeder- Root TLS-3XX Operators Manual (57601 & 610) <br /> • Veeder-Root TLS -3XX Setup Manual (576013 - 623) !l1 � <br /> • Veeder-Root TL&450 Setup and Operation Screens Manual (577013- 940) '`°: <br /> • Veeder- Root TL&450PLUS/TLS4 Operator's Manual (5770114- 1 10) <br /> • Veeder- Root TLS4 Quick Start (577014 -034) f <br /> • Veeder- Root Overfill Alarm Installation Guide (576013 -589) <br /> Consoles <br /> TL&450PLUS, TLS4c, TLS4i , TL&450 and TLS3XX <br /> Requirements <br /> TLS -450PLUS , TLS4c, TLS4i , TLS-450 : Automatic Event : Device Task programmed to trigger on Tank Overfill and <br /> close a relay feeding voltage to the Overfill alarm device. <br /> i <br /> TL&UX : Output relay programmed to close a relay on a Tank Overfill alarm feeding voltage to the Overfill alarm <br /> device . <br /> E <br /> Testing Procedure <br /> 1 . Inspection <br /> a. Verify the levels in the tank to make sure there is product in the tank and that the tank is enabled . <br /> b. If the site is currently receiving a delivery, wait until the delivery is complete. <br /> c. If the tank is performing a SLD tank test , stop the test. <br /> 2 . Preparation <br /> a. Turn Alarm filtering off, as this will allow you to clear alarms quicker. Refer to TL&3XX Setup manual <br /> (576013 - 623) or TLS4XX on-line help . <br /> b. Program Delivery delay to 1 minute , this will allow the delivery to be completed quicker. <br /> 1 . Note the customers original value, so you can restore it after the test. <br /> 24 <br /> I <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.