My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:47:21 AM
Creation date
9/18/2020 3:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C ( continued ) <br /> 71 SO Overfill Valve in Tank Complete Shut Off Level Worksheet <br /> Important : This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions . All length measurements are in inches . Please contact the Authority Having Jurisdic- <br /> tion (AHJ ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region , as well as take into account other considerations such as extreme tank tilt . <br /> Take the following measurements with the valve in - <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast = - - - <br /> lug in the 71 SO body ( see figures) , upper tube length . <br /> Note : the Upper Tube Length must be at least 16" to in - <br /> clude the protective bend in the tube . <br /> ( D ) _ <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . <br /> (W) _ ( D) <br /> ( U ) = Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note : If a tank bottom protector is present it IL <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0 .6") (W) Valve <br /> ( B) = Length, <br /> bottom <br /> From the tank calibration chart provided by tank manu - of cut <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100 % volume . (B) <br /> (Y) = To Tank <br /> 1 . To determine complete shut-off percentage: Tank <br /> Subtract upper tube length ( D) from distance to tank ( U) Valve Chart <br /> bottom ( B ) Length, 100 % <br /> (X) _ ( B) - ( D) + 1 . 5 = top of Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal - <br /> culated (X) dimension and the 100 % volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = <br /> (Y) tank capacity in gallons = <br /> Complete SO% _ ( X) capacity / (Y) capacity x100 = <br /> Note : The overfill valve must be installed per AM re- <br /> quirements and all applicable local , state, and national <br /> codes . If the overfill valve is set above the allowable <br /> shut-off percentage the overfill valve must be removed <br /> and replaced . <br /> Note. This Appendix only applies to valves installed per Appendix C . See Appendix B for the standard valve <br /> installation tank shut off level worksheet . <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.