My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2300 - Underground Storage Tank Program
>
PR0506497
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2020 10:36:12 AM
Creation date
9/21/2020 9:05:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506497
PE
2351
FACILITY_ID
FA0007461
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREVENTATIVE MAINTENANCE <br />Annually, inspect the flapper in the 7150 to see that it is <br />open by looking down the drop tube opening. Test the <br />7150 drop tube seals with CARB procedure TP -201.1 D. <br />If the drop tube seal passes testing, no further mainte- <br />nance is required. If the drop tube fails testing, replace <br />the drop tube seal with OPW PIN: H11931 M for 4" <br />Tubes. Re -test the 7150 drop tube with GARB proce- <br />dure TP -201.1 D. The lower tube o -ring seal OPW PIN: <br />H14840M can also be replaced. 1f this does not correct <br />the leak the 7150 needs to be replaced. <br />FOR TESTABLE MODELS ONLY: The socket adaptor <br />can be removed and poppet and float movement and <br />function inspected without removing the valve. See <br />Page 17 forfull testing details. If replacement parts are <br />needed for testable models the following items are <br />available: OPW PIN 206741 Testable Inlet Tube 51A, <br />206740 Socket Adaptor and Cable Assembly, and 61 SOK <br />CAUTION: Do not insert any foreign object into drop <br />tune if flapper is in the closed position. For exam- <br />ple, a tank level measuring stick. This will damage <br />the valve and void the Warranty. ALWAYS check <br />flapper location before "sticking" the tank. If flap- <br />per is in the closed position, the tank is either over- <br />filled and you need to wait until the liquid level goes <br />down or the 71 SO Is damaged and needs to be re - <br />7150 Performance Specifications <br />This overfill Prevention Valve has been manufactured <br />and tested to, and met, the following California specifi- <br />cations. Performance Requirement: Leak rate to be less <br />than or equal to 0.17 CFH@2.W W.C. <br />Torque Specification <br />Taptite Screws, #10-24 thread cutting, 70 in -lbs mini- <br />mum to 35 in -lbs maximum. Testable Models Only; <br />Socket Adaptor, 114" NPT, 3.5 ft -lbs 02 in -lbs} minimum <br />to 5.0 ft -lbs (60 in -lbs) maximum. <br />IMPORTANT: Leave these installation instructions <br />and maintenance procedures with the station opera- <br />tor. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.