Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEMA CERTIFICATION FORM (Page a of s) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel Is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br /> functionally tested , and confirmed operational ? ® ❑ ❑ <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ® ❑ ❑ <br /> their ro er operation *? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? ❑ ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? WJ ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ El ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e.g . , modem) operational? © ❑ <br /> For any answer of Wl above, describe in Section IX how and when these deficiencies were or will Abe <br /> IX. COMMENTS <br /> Replaced TLS Battery for PM Purpose . <br /> i <br /> I <br /> i <br /> I <br /> i <br /> i <br /> X. INJANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for 91 ❑ ❑ <br /> round faults? <br /> Were all In-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br /> tested and confirmed operational? [71 ❑ ❑ <br /> Was accuracy of system's product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested ? © ❑ ❑ <br /> Were all probes reinstalled properly? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Q ❑ ❑ <br /> For any answer of "N " above, describe in Section XI how and when these deficiencies were or will be corrected, <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />