My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2 drain valve passes testing no further maintenances <br /> required . If the drain valve fails testing , remove the <br /> Step 8 : (See Figure 3 & 4) valve , soak in water and use high -pressure air, if <br /> Install adjusting system beneath tabs on mounting needed , to clean . Reinstall the drain valve to its <br /> ring . See Figure 3 for standard cover models . See proper position and test the valve with CARB <br /> Figure 4 for sealable cover models . Add shims as procedure TP-201 . 1 C or TP-201 . 1 D . If problems <br /> needed and adjust with screw . (Shims must be cut persist, replace the drain valve with P/N 1 DK-2100- <br /> to size for sealable cover models . ) The height can EVR (specified torque 11 . 5 ft-Ibs min to 13 . 5 ft-lbs <br /> be increased up to 1 " (2 . 5cm ) . max , 5/16- 18 UN thread) . The sealable cover ( 1 SC) <br /> Note: The adjustment should not be more than 1 It <br /> adjustment nut is set at the factory , but due to <br /> from the initial length of the unit. environmental conditions it may be necessary to <br /> adjust it to either improve sealing or ease cover <br /> Step 9 : removal . <br /> Upon preliminary installation perform the California <br /> Test Procedures TP-201 AC or equivalent . Their Important : Leave these instructions with Station <br /> Test Procedures will check the seals between the Operator. <br /> drain valve , nipple and rotatable adapter. To test <br /> the spill containers base and bellows fill the <br /> container with water. A drop in the water level of <br /> 1 /16" or greater after one hour means that a leak <br /> exists . To determine where the leak is , look for a - <br /> steady stream of bubbles coming from one of the - <br /> joints or water leaking on the outside of the bucket . <br /> NOTE : Do not drain the water into the UST after the ht ig �� <br /> Shims <br /> test is complete . Water must be disposed of per He <br /> local requirements for hazardous waste . If the leak Adjustment Bolt r <br /> J <br /> cannot be corrected the spill container should be ---- - - - - - <br /> replaced with another. - - - Cap <br /> Adapter <br /> Step 10 : (See Figure 2) Figure 3 - Standard Cover Model Height Adjustment <br /> Before pouring concrete , place plastic over the cover <br /> and mounting ring protecting them from concrete <br /> splash . Double check that the unit is level and at <br /> proper grade height . Pour concrete per figure 2 . <br /> Ramp or dome the concrete away from the mounting <br /> ring . There should be a minimum of 1 " slope to <br /> finish grade . The concrete surface should start at <br /> the bottom edge of the watershed slots and tapered <br /> down to grade level . <br /> NOTE; Do not stand on spill container before i7 <br /> concrete sets up. <br /> Remove plastic from cover after concrete has dried . Shims Must Tm <br /> Height <br /> Remove adjustment system . Adaptor and tight fill Bet To Adjustment <br /> cap can now be installed in sealable cover models . Length Boit <br /> Re-test the spill containers for leaks as described in <br /> step 9 , after the concrete has set up . Use oPW <br /> 116-7085 or <br /> 4" Pipe Cap <br /> Operation and Maintenance . to Support Nipple <br /> Annually : Inspect and clean the interior of the spill Adjustment <br /> container and drain valve screen . Remove System <br /> accumulated dirt and grit. Test the drain valve using Figure 4 - Sealable Cover Model height adjustment <br /> CARB procedure TP -201 . 1 C or TP -201 . 1 D . If the <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.