My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r(,`))PERM 200-17 <br /> APPENDIX A-1 <br /> ® SO LUT 1CONTAIN 0ENS. HYDROSTATIC STAND PIPE TANK TEST CHECKLIST <br /> Job Name: <br /> Address: City: State: <br /> / Record date/time when tank was last filled(wait 24 hours from last delivery) <br /> / Record today's date/time <br /> Record tank U.L number(if known) <br /> Product stored <br /> Tank nominal capacity(gallons)• <br /> Preparation: <br /> 1.Measure and record groundwater table level. <br /> L Fill reservoir riser pipe approximately 12"over reservoir top.The level <br /> in the riser pipe must be at least 12"higher than the groundwater table. <br /> 3.Diameter of reservoir riser pipe. <br /> 4.Inspect all exposed monitoring fitting plugs for leaks. <br /> Begin test: <br /> 5.Record time(wait 3 hours after step#2). <br /> 6.Measure and record liquid level In reservoir riser pipe. <br /> 7A.Measure and record groundwater table level. <br /> 7B.Record dispenser meter readings. <br /> S.Record time(after steps#6 and#7,wait 4 hrs for 4,6;5'tanks or 6 hrs for 10'dia.tanks). <br /> 9.Measure and record liquid level in reservoir riser pipe. <br /> 10A.Measure and record groundwater table level. <br /> 10B.Record dispenser meter reading. <br /> End test: <br /> Calculate changes: <br /> 11 A.Reservoir riser pipe level(step#6 minus step#9). <br /> 11 B.Groundwater level(step#7 minus step#10A). <br /> 11 C.Dispensed product(step#7 minus step 010B). <br /> Results Interpretation-The calculated changes(lines 11 A,118,and 11 C)must meet all of the criteria In column"B'below to pass the <br /> tightness test of.05 gallons per hour with a 95%probability of detection and a 5%probability offalse alarm: <br /> (A) (B) (C) <br /> Criteria Tank passes test if.. Tank testis Inconclusive If... <br /> Line#11 A Less than 1" More than 1— <br /> Line#11 B and less than 10" or more than 10""' <br /> Line#11 C and less than 600 gallons or more than 600 gallons <br /> You can use a tape measure and water/brine finding paste to determine accurate Ilquld <br /> levels in site wells and the reservoir. <br /> Max tank diameter 10;Max capacity 30,000 gallons Date <br /> "Repeat test steps 6-11 <br /> -To Improve test accuracy,discontinue dispensing,then repeat test steps 6-11 <br /> Note:A 99.9%PD and 1.296 PFA tightness test without dispensing Is available by Technician's Name <br /> contacting CSI Field Service <br /> 333 North Rivershire Dr.,Suite 190-Conroe,TX 77304•(936)756.7731•www.containmentsoluUons.com <br /> Copyright 0 2017 Containment Solutions,Inc.•All Rights Reserved•January 2017-Pub.No.FS 140128 <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.