My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RM 200-17 <br /> HYDROSTATICAPPENDIX C-3 <br /> SPILL BUCKET INTEGRITY TESTING OD <br /> SINGLE-AND DOOD <br /> Facility Name: Owner: <br /> Address: Address: <br /> City,State,Zip Code: City,State,Zip Code: <br /> Facility I.D.#: Phone#: <br /> Testing Company: Phone#: Date: <br /> This procedure is to test the leak integrity of single-and double-walled spill buckets.See PEI/RP1200 Section 6.2 for hydrostatic test <br /> method,Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. <br /> Tank Number <br /> Product Stored <br /> Spill Bucket <br /> Capacity <br /> Manufacturer <br /> Construction ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled <br /> ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled <br /> Test Type ❑Hydrostatic ❑Hydrostatic ❑Hydrostatic ❑Hydrostatic ❑Hydrostatic ❑Hydrostatic <br /> ❑Vacuum ❑Vacuum ❑Vacuum ❑Vacuum ❑Vacuum ❑Vacuum <br /> ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled <br /> ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled <br /> Spill Bucket Type ❑Product ❑Product ❑Product ❑Product ❑Product ❑Product <br /> ❑Vapor ❑Vapor ❑Vapor ❑Vapor ❑Vapor ❑Vapor <br /> Liquid and debris <br /> removed from ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> spill bucket?* <br /> Visual Inspection <br /> (No cracks,loose <br /> parts or separa- ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> tion of the bucket <br /> from the fill pipe.) <br /> Tank riser cap ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> included in test? ❑NA ❑NA ❑NA ❑NA ❑NA ❑NA <br /> Drain valve ❑Yes ❑No ❑Yes ❑Nc ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No []Yes ❑No <br /> included in test? ❑NA ❑NA ❑NA ❑NA ❑NA ❑NA <br /> Starting Level <br /> Test Start Time <br /> Ending Level <br /> Test End Time <br /> Test Period <br /> Level Change <br /> Pass/fail criteria: Must pass visual inspection.Hydrostatic:Water level drop of less than 1/8 inch;Vacuum single-walled only: <br /> Maintain at least 26 inches water column;Vacuum double-walled:maintain at least 12 inches water column. <br /> Test Results ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail I ❑Pass ❑Fail 1 ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments: <br /> All liquids and debris must be disposed of properly. <br /> Tester's Name(print) Tester's Signature <br /> 0 pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.